Concept / demo project — not a real client · Designed by DDDD

How a build runs

Five stages, from the first visit to the day we hand back the keys. Design and pricing come first, so the building stage has as few open questions as possible.

  1. First visit

    Before anything is drawn

    We come to the house, walk through it with you and listen to what isn’t working. We look at the things that limit what’s possible: the structure, the plumbing and wiring, and how the house sits on its lot.

    Afterwards you get a short note in plain English: what we heard, what we think is possible, and what the next stage would involve.

    You
    Show us around and tell us how you live in the house.
    You get
    A written summary and an honest view on whether we’re the right firm.
  2. Design and price

    Before any work on the house

    We measure the house and draw the change: floor plans, the views that matter, and the details that affect cost. You choose the materials, fixtures and finishes with us, room by room.

    Then we price the drawings line by line and give you one fixed price in writing. If you add something later, you see the cost before you decide.

    You
    Review drawings, make choices and tell us what to change.
    You get
    Drawings, a list of everything chosen, a schedule and a fixed price.
  3. Permits and ordering

    Once you sign off on the design

    We prepare and submit the permit drawings and deal with the city or county on your behalf. While we wait for approval, we order anything that takes a long time to arrive, like windows, cabinets and special fixtures.

    You
    Sign the forms we prepare. That’s usually it.
    You get
    A start date, and a plan for living at home during the work if you’re staying.
  4. Building

    Our crew on site each working day

    Our own crew does the building, with trusted trades for specialist work. One project lead is your contact from start to finish and answers your questions.

    Once a week we walk through the work with you and send a short written update: what got done, what’s next, and any decision we need from you.

    Older houses hide things. If we open a wall and find something that changes the plan, we stop, show you, and price the fix before going further.

    You
    Join the weekly walk-through and answer any open questions.
    You get
    One contact, weekly updates and no surprise bills.
  5. Handover

    When the work is complete

    We walk through the finished house together and write down anything that isn’t right yet. We fix everything on that list before we call the job done.

    You get a folder with the final drawings, product information and care instructions, plus the warranty terms in writing: [demo warranty terms].

    You
    Walk through with us and point out anything you’re unsure about.
    You get
    The keys, the paperwork and a number to call if something comes up.

Common questions

Can we stay in the house during the work?

Often, yes. For kitchens we can set up a temporary kitchen elsewhere in the house. For larger remodels we’ll tell you honestly during design whether staying makes sense, and plan the order of work around it.

Why design and price before building?

Because most of the stress in a renovation comes from decisions made in a hurry, halfway through. When the drawings and choices are settled first, the price can be fixed and the crew can just build.

What if we change our minds partway through?

You can. We write down the change, tell you what it costs and how it affects the schedule, and only go ahead once you agree.

Who do we talk to?

One project lead, from the first visit to handover. You won’t be passed between a designer, an estimator and a site manager.

Start with a first visit.

Tell us a little about the house and what you’d like to change, and we’ll arrange a time to come and see it.